Quick reactions and groundbreaking solutions: zinkgruvan wind farm challenged our coordination

Year of Publication:

A 14-turbine wind farm was built on an old mining area in 2018. In addition to transport, Silvasti also in charge of port handling. The route from the port to the site was very long, 325 kilometres,...

It’s windy at the top: silvasti involved in a major project of norway’s statkraft

Year of Publication:

Silvasti’s experience of challenging conditions is an absolute prerequisite in Norway’s mountainous landscape where the world’s largest wind farm – for the moment – was built in 2018. The...

33 X WIND TURBINES WERE DELIVERED TO EGERSUND, NORWAY

Year of Publication:

Silvasti has delivered total of 33 x wind turbines to wind farm in Egersund, Norway. Along with road transports project included also port operations in Egersund port. Route from port to the site was...

SILVASTI DRIVING FINLAND FORWARD: A LARGE-SCALE WIND FARM IN METSÄLÄ

Year of Publication:

In 2017, the largest wind farm in Finland was carried to Kristinestad by Silvasti. Implementing such a large project required Silvasti’s experience of demanding special transport, as well as our...

22 WTG’S WERE DELIVERED IN SWEDEN

Year of Publication:

During autumn 2017 Silvasti delivered total of 22 x wind turbine generator components to wind farm called Solberg in Sweden. Project included more than 200 transports in total. Components were...

Silvasti delivered turbines to the largest wind farm in norway

Year of Publication:

In January 2017, started wind turbine component transportations to the so far largest wind farm site in Norway. Components were transported from port of Egersund to the wind farm of Tellenes, route...