References
Blaiken wind power project
Year of Publication:
In 2016 Silvasti finished transports to Blaiken mountain at Northern Sweden. This project included over 300 special transports to one of the biggest land based windparks in Europe in...
6m wide pressure vessel from Estonia to Finland
Year of Publication:
Silvasti transported one of the largest, if not largest special transport from Estonia to Finland in July 2016. A huge pressure vessel was transported to Äänekoski, over 400 km by road. The total...
ALLU Finland OY: “Smooth operation is our number one criterion
Year of Publication:
ALLU Finland Ltd designs and manufactures products for environmental care, improving recycling methods and the processing of different materials. 90% of the company’s production is exported. The...
2 pcs of 227 tn transformers to Loviisa NPP
Year of Publication:
In May 2016 Silvasti delivered two heavy transformers from Loviisa harbour to Nuclear Power Plant in Loviisa. Each transformer weighed 227 tons and the combination gross weight was up to 323 tons....
43m long rails from Belgium to Finland
Year of Publication:
Silvasti delivered 43 meter long rails from Antwerpen, Belgium to a town of Pieksämäki, Finland. Rails with this length are very challenging to support and transport due to material...