References
110 tn transformer delivered to extremely challenging destination in Norway
Year of Publication:
In April 2017 Silvasti delivered 110 tn transformer to Norwegian mountains and the route wasn’t the easiest one. In April 2017 Silvasti delivered 110 tn transformer to Norwegian mountains and...
6,30 m wide tanks to Russia
Year of Publication:
In April 2017 Silvasti transported 2 x 6,30 m wide tanks to Ivangorod, Russia. In April 2017 Silvasti transported 2 x 6,30 m wide tanks to Ivangorod, Russia. The overall dimensions of the tanks...
7,45m wide tank
Year of Publication:
In January 2017 Silvasti loaded 7,45 m wide tank which was transported over 300 km to its final location. Tank weighed 15 tons and it was 10 meters...
Steam accumulator transport in challenging winter conditions
Year of Publication:
In November 2016 Silvasti transported 62 ton heavy steam accumulator in challenging winter conditions. Project included unloading by skidding and installations onto...
One of the largest special transports ever transported in Finland
Year of Publication:
Silvasti Transported in September 2016 one of the largest special transports ever transported in Finland. Two bleaching tower sections were transported over 400km by road from Pietarsaari to...