References
transportation of a 69tn transformer from Vaasa to Borlänge
Year of Publication:
Silvasti Ltd transported 69 ton transfromer from ABB’s factory in Vaasa to Borlänge, SWE. Transport was challenging because of it’s height, 490 cm. Route to final destination was about...
Silvasti transported massive bridge blocks to Kasnäs
Year of Publication:
Silvasti transported 5 massive steel structures from Kalajoki, FIN to Kasnäs, FIN. These bridge blocks were used for a new 470 meters long bridge at Lövö. Silvasti’s scope included loading...
Reactors in Belarus
Year of Publication:
In February 2011 Silvasti moved 6 x reactors in Belarus. Dimensions were: lenght 40,0 m, diameter 4,4 m, and weight 300 tons. Transports were carried by 14 x Scheuerle InterCombi axlelines with...
A 88tn transformer from Germany to Sweden
Year of Publication:
The transportation was performed in extreme winter conditions in Dragaliden, Sweden. Silvasti’s workers are familiar with cold and snow. Everything was transported in due time. At the...
88tn transformer from Germany to Sweden
Year of Publication:
The transportation was performed in extreme winter conditions in Sweden. Silvasti’s workers are familiar with cold and snow. Everything was transported in due time. At the destination, in...