Wind energy in Northern Sweden
Year of Publication:
Categories:
- Wind power logistics |
In August 2009 Ville Silvasti Ltd transported several 3MW Nacelles which each were weighing 127 tons from Finland to Northern Sweden.
In August 2009 Ville Silvasti Ltd transported several 3MW Nacelles which each were weighing 127 tons from Finland to Northern Sweden.
Case:
– local road transport in Finland
– reloading to a barge
– sea transport to Sweden
– 300 km road transport to ad estination in Uljapuouda mountain
The final destination was in very challenging place. During the last 5 km there were a vertical climb of 330 meters and the most inclined angle was 14 %. Last 5 km were driven with the help of a big dumper truck. The project contained also transportation of hubs and some 44 meters long blades.