transportation of a 69tn transformer from Vaasa to Borlänge
Year of Publication:
Categories:
- Special transport |
Silvasti Ltd transported 69 ton transfromer from ABB’s factory in Vaasa to Borlänge, SWE. Transport was challenging because of it’s height, 490 cm. Route to final destination was about 1000 km long.