Sinovel turbines in Sweden
Year of Publication:
Categories:
- Wind power logistics |
Silvasti transported of 2 x 3MW Sinovel wind turbines in Molkom, Sweden.
![](https://silvasti.com/wp-content/uploads/2021/12/b8b67b7b_dsc_0486_downsized_640x423_view_600x396-1-1024x676.jpg)
![](https://silvasti.com/wp-content/uploads/2021/12/21567e9f_img_1505_view_600x336-1024x573.jpg)
![](https://silvasti.com/wp-content/uploads/2021/12/870c2ac9_dsc_0569_downsized_640x423_view_600x396-1024x676.jpg)
Silvasti´s scope was to transport and erection of 2 x 3MW Sinovel wind turbines in Molkom, Sweden.
The biggest transport dimensions of turbine components were:
– Nacell 13,5 x 5,0 x 4,2 m and 125 tons
– Blades 55,0 x 3,4 x 3,4 m
– Towers 30 x 4,3 m and 82 tons