Silvasti hauls turbine parts for the riga hydroelectric power plant

Year of Publication:

Running across Latvia, the Daugava river passes through three hydroelectric power plants before flowing into the Baltic Sea. The westernmost of them is the Riga power plant, 15 km upstream of the...

Smooth co-operation oiled silvasti’s wheels once again: transport to Guleslettene wind farm broke speed records!

Year of Publication:

A wind farm producing electricity with 47 turbines was installed in the mountainous landscape of Guleslettene. The winds blowing on the mountainside were extremely favourable for the project, so both...

Wind power in denmark is renewing – and silvasti does not shy away from winds of change

Year of Publication:

There is constant need for new wind power projects, even in a pioneering country like Denmark. Along with new technology, the power of wind farms has increased rapidly in the last few decades....

Silvasti went underground: taking a crusher into the depths of a gold mine in kittilä

Year of Publication:

In July 2020, Silvasti had a chance to prove its innovativeness when a 40-tonne crusher had to be transported into the Kittilä gold mine. The serpentine road into the depths of the mine is seven...

The Northern Silvasti in its element: deliveries to Åliden and brattmyrliden wind farms in winter conditions

Year of Publication:

The roads leading up to the Åliden and Brattmyrliden sites are not lacking in steep slopes. In addition to the sloping terrain, round-the-clock timber transports and the lack of meeting places along...

The largest road transport of the year: obstacles did not slow down the gigantic sorting line

Year of Publication:

Silvasti transported a 90-metre sorting line from Alajärvi to Parkano in spring 2020. The transport was divided into three parts due to the demanding nature of the disassembly and assembly. The two...